The deliverable

A construction scope of work, generated in minutes.

A scope of work is the document that states exactly what will be built, with what materials, to what standard, on what schedule. Describe your project and AXTruo prepares three of them: a DIY version, a Standard build and an Upgrade, each itemized line by line.

What it containsA-201

Six things a scope has to put in writing.

If a document is missing any of these, it is a quote wearing the word scope. Every AXTruo scope carries all six, in every tier.

1.1

Materials, by grade and dimension

Not "cabinets" but the construction, the species, the finish and the linear feet. The grade is where quotes diverge most and where a vague line hides the largest swing in price.

Brand or grade · dimensions · quantity · unit cost

1.2

Labor, priced by the work it covers

Demolition, disposal, site protection, rough-in, install and finish are separate operations. Rolling them into one figure is what makes two bids impossible to compare.

Operation · hours or rate · what is included

1.3

Permits as their own line

Permit and inspection costs belong on the page, not absorbed into an allowance. Whoever is paying should be able to see them and check them.

Permits · inspections · who pulls them

1.4

Contingency, stated as a percentage

Every renovation meets something behind the wall. A scope that carries no contingency is not optimistic, it is incomplete, and the overage arrives later as a change order.

Contingency percentage · what it covers

1.5

Overhead and profit, shown rather than buried

Margin is a legitimate line on any construction job. Printing it is the difference between a document you can negotiate and a number you can only accept or refuse.

Overhead and profit percentage

1.6

Schedule, risks and exclusions

How long the work runs, what could move it, and what is explicitly not included. Exclusions prevent most disputes, and they cost nothing to write down.

Duration · risks · exclusions · quality standards

Why it mattersA-202

The document is the whole negotiation.

Bids only compare if the scope does.

Three contractors quoting from three different mental pictures produce three numbers that cannot be compared. Hand all of them the same itemized document and the differences that remain are real: better material, more hours, a different sequence. That is a decision you can actually make.

A lump sum hides the reasoning.

One figure with no breakdown tells you nothing about whether it is fair. You cannot see which line is expensive, which is missing, or which assumption you disagree with. The itemization is the argument, and without it you are just deciding whether you trust someone.

Change orders start as omissions.

Most budget overruns are not surprises, they are things that were never written down. Permits, disposal, site protection, contingency. Naming them at the start moves the conversation to before the work rather than halfway through it.

Using itA-203

Written to be handed over.

Export

Download any tier as a branded PDF, generated on your side of the wire.

Share

Send a read-only link a contractor opens without creating an account.

Compare

Bids land against one baseline, so the differences that remain are real.

Verify

Have an expert reprice it when the decision needs a firmer number.

How firmA-204

A planning number, then a real one.

The generated scope is a planning-stage estimate with a cost range. It is enough to understand the project, weigh the options and set a budget, and it is far more than most people have when they start calling contractors. It is not a signed contract price, and we will not pretend otherwise.

When you need the number to be firm, an Expert Review puts a construction professional over the scope. They correct the pricing against what the work would actually cost to deliver, which turns the range into a near-exact estimate.

How the Expert Review works

Every line shown

Stop describing the job. Document it.

Ten minutes of guided questions and you have three scopes you can put in front of any contractor.

Generate your scope
ScopesThree per project
FormatBranded PDF
SharingRead-only link
CostFree to generate
TimeAbout 10 min

Want the cost side first? Renovation cost estimates covers how the pricing is built.